Minnesota Power Advances Solar Projects with Boswell and Regal Solar Farms
Minnesota Power is advancing two significant solar projects, Boswell and Regal Solar, as part of its renewable energy expansion. The Boswell Solar project, located in Cohasset, Itasca County, will feature 177,675 bifacial solar panels on single-axis trackers, covering 500 acres and generating 85 megawatts. It will connect to the grid via a 2.5-mile line to an existing substation. The Regal Solar project, near Royalton, will have 255,000 panels over 800 acres, producing 119.5 megawatts, requiring a new substation and a 3.5-mile line. Both projects are expected to be operational by mid-2027, contributing to Minnesota Power's goal of over 80% renewable energy by 2030.