UDOT Announces Winter Hiatus for Logan Canyon Fiber Project, Roadway Reconstruction Slated for 2027
The Utah Department of Transportation (UDOT) has announced a winter hiatus for the Logan Canyon Fiber Project, with crews expected to complete fiber-optic cable connections within the next week, weather permitting. This project, which began in spring 2025, aims to improve broadband access and connectivity for Logan City, Garden City, and Beaver Mountain Resort. Motorists are advised to exercise caution due to trenches, uneven road surfaces, and loose gravel. Separately, J-U-B Engineers provided an update on the First Dam Tank & Waterline Project along Canyon Road. This project has involved installing critical water infrastructure for Logan City and will transition into roadway improvements. Temporary pavement will be laid on Canyon Road this fall, and utility work, including natural gas pipeline work, will continue through the winter of 2026-27. Full roadway reconstruction, including storm drains, curbs, gutters, sidewalks, and landscaping, is planned for spring and summer of 2027 between 600 East and 1500...