Boston Children's Museum Begins $15M Flood Protection Project
The Boston Children's Museum, located on the banks of the Fort Point Channel in Boston, Massachusetts, has launched a $15 million initiative to safeguard itself against flooding and sea level rise caused by climate change. The museum, which experienced flooding during a severe winter storm in 2018, is one of the city's most vulnerable institutions to such risks. Phase 1 of the project, expected to take two years, includes installing a waterproof membrane around the building, raising utilities, and adding underground drainage systems, tanks, and pumps. Deployable flood barriers will also be used during storms. A ceremonial groundbreaking was held, with construction set to officially begin on August 17, 2026. Phase 2 will focus on transforming the Harborwalk into a waterfront park for added flood protection and public enjoyment.