Floating Pool Project in East River to Undergo Test Run Amid Safety Concerns
The long-awaited + POOL project, a floating pool concept in New York City's East River, is set to undergo a 'dry' test run this summer. The initiative, which began in 2010, aims to create a swimmable area filled with filtered river water. The test will address safety and cleanliness concerns raised by the Health Department, which has delayed the project due to bureaucratic setbacks. The pilot pool, a smaller version of the final design, will be deployed near Pier 35 and the Manhattan Bridge. Weekly water quality tests will be conducted throughout the summer to ensure the pool's safety before its anticipated opening next year.