NRC Issues Construction Permit for X-energy's Texas SMR Project, Raising Safety Concerns
The Nuclear Regulatory Commission (NRC) has granted a construction permit to X-energy for its four small modular reactor (SMR) project in Texas. This marks the first time in over 50 years that a high-temperature gas-cooled reactor has received such a permit, and it is the third advanced reactor permit issued by the NRC this year. The project, planned for Seadrift, Texas, will power Dow’s UCC Seadrift Operation manufacturing facility, which currently relies on natural gas. X-energy aims to have the first of its Xe-100 SMR reactors online by the early 2030s. The construction permit application, filed by Dow’s subsidiary Long Mott Energy in March 2025, received a streamlined licensing review. However, Edwin Lyman, Director of Nuclear Power Safety at the Union of Concerned Scientists, has criticized the decision as a 'reckless approval,' citing concerns about the reactor design's lack of a physical containment structure and unproven safety functions.