Nuclear Regulatory Commission Issues First High-Temperature Gas-Cooled Reactor Construction Permit in Nearly 60 Years
The Nuclear Regulatory Commission (NRC) has issued a construction permit for the Long Mott Generating Station in Calhoun County, Texas. This marks the first construction permit for a high-temperature gas-cooled reactor in nearly 60 years and is the third advanced reactor construction permit issued by the NRC this year. Long Mott Energy plans to build a four-reactor facility, featuring four X-energy Xe-100 reactors. The primary purpose of this facility will be to generate high-temperature steam for industrial use at the Dow Seadrift Operations site, with excess electricity being exported to the grid. This permit represents several regulatory firsts for the NRC, including its first approval of a multimodule advanced reactor facility, a reactor with a pebble-bed core, a design with online nuclear refueling, and a review of a high-temperature gas-cooled reactor under the agency’s risk-informed, technology-inclusive Licensing Modernization Project framework. NRC staff completed the safety evaluation ahead of sc...