A greenfield airport at Doloo in Assam’s Silchar and a second container terminal at Kamarajar Port in Tamil Nadu were two major outcomes of a Cabinet meeting chaired by Prime Minister Narendra Modi on Wednesday.
The Cabinet Committee on Economic Affairs (CCEA) approved the construction of a new airport at Doloo in Assam’s Silchar at an estimated cost of Rs 2,014 crore, while the Union Cabinet cleared the development of a second container terminal at Kamarajar Port in Tamil Nadu under a public-private partnership (PPP) model at an estimated cost of Rs 4,288.26 crore.
New Airport For Silchar
The new airport at Doloo will help overcome severe operational and spatial constraints of the existing landlocked defence civil enclave at Silchar airport and accommodate sustained passenger growth, an official release said.
Doloo is in the Cachar district of Assam and serves as the strategic heart of the Barak Valley, a region renowned for its tea gardens, agro-based industries and potential for eco and cultural tourism.
The existing Silchar airport, owned by the Indian Air Force and the Airports Authority of India (AAI), operates a civil enclave spread over 70 acres.
The Barak Valley’s growth story is all set to soar to new heights!
The Cabinet has approved the development of a Greenfield Airport at Doloo, Silchar.
5 exciting things about this project:
✈️ Capability of handling large aircraft.
✈️ A modern terminal capable of handling heavy passenger traffic during peak hours.
✈️ Enhanced air connectivity for Southern Assam and adjoining states.
✈️ A major boost to trade, tea and agro-based industries.
✈️ New opportunities in tourism, investment and employment.
https://t.co/Lh8Nr82Lmw
— Narendra Modi (@narendramodi) November 25, 2026
Briefing the media after the Cabinet meeting, Information and Broadcasting Minister Ashwini Vaishnaw said the airport will have the capacity to handle 800 passengers during peak hours and an annual passenger-handling capacity of 1.01 million.
The project is estimated to cost Rs 2,014 crore and will be fully funded by AAI through its own internal resources.
The proposed terminal building will span 12,351 square metres and have the capacity to handle 800 passengers during peak hours. It will be designed with modern passenger amenities, sustainable green-building principles and modular expansion capability.
The project also encompasses the development of a 2,705-metre-long and 45-metre-wide, Code-4C-compliant runway suitable for A-320 aircraft operations, along with a new apron capable of parking six A-320 aircraft and a dedicated isolation bay, the release said.
Vaishnaw said the airport will provide connectivity to the Barak Valley and adjoining northeastern regions and help promote tourism.
According to the release, the new airport will meet the rapidly growing demands of air traffic in South Assam and adjoining areas of neighbouring states. It is expected to significantly decongest existing infrastructure, unlock regional economic potential by boosting trade and tourism, and offer a gateway integrating Northeast India with broader national and international growth corridors.
Second Container Terminal At Kamarajar Port
The Union Cabinet approved the development of the second container terminal at Kamarajar Port in Tamil Nadu under a public-private partnership (PPP) model at an estimated cost of Rs 4,288.26 crore.
According to an official statement, the project envisages a 900-metre-long container terminal with a design draft of 18 metres and an annual container-handling capacity of 2 million twenty-foot equivalent units (TEUs), to be implemented in two phases. The project will be developed on a design, build, finance, operate and transfer (DBFOT) basis.
The estimated project cost of the PPP component is Rs 4,288.26 crore, including GST, comprising Rs 2,429.32 crore for Phase I and Rs 1,858.94 crore for Phase II.
“The investment is to be arranged by the selected concessionaire under the DBFOT model,” the statement said, adding that the project proposal separately indicates an estimated dredging cost of Rs 450 crore to be borne by Kamarajar Port Ltd (KPL).
The terminal is designed to handle large container vessels, including vessels of up to 24,346 TEUs and 400 metres in length overall, with a design draft of 18 metres. This will strengthen KPL’s ability to handle larger mainline vessels and improve connectivity with international shipping routes.
The project is intended to meet the growing demand for containerised export-import (EXIM) cargo from the Chennai-Ennore industrial and economic region and the wider southern hinterland. Key cargo-generating sectors include automobiles and auto components, engineering goods, electronics, chemicals and other manufactured products, the statement said.
KPL handled 49.08 million tonnes of cargo and 1,008 vessels during FY 2025-26, including more than 7 lakh TEUs of container traffic. The existing container terminal has an installed capacity of 0.8 million TEUs per annum and handled approximately 0.7 million TEUs in FY 2025-26, representing utilisation of about 88 per cent.
The project is aligned with Maritime India Vision 2030 and Maritime Amrit Kaal Vision 2047. It is expected to strengthen KPL’s position as a container gateway on India’s East Coast, improve the efficiency of the maritime logistics chain and support the growth of EXIM trade.
Kamarajar Port, formerly known as Ennore Port, is one of India’s 12 major ports and is wholly owned by Chennai Port Authority under the Ministry of Ports, Shipping and Waterways. Located on the east coast of Tamil Nadu near the Chennai industrial and economic region, the port handles a range of cargo, including coal, petroleum, oil and lubricants, LNG, LPG, containers, automobiles and general cargo.
















