Egmore Station Undergoes Upgrades
Chennai Egmore railway station is currently the site of significant infrastructure work, specifically focusing on platforms 10 and 11. This maintenance
includes roofing and other construction activities, necessitating temporary adjustments to the departure points of several important express services. Southern Railway is implementing these changes to ensure operational continuity while essential upgrades are carried out, aiming to enhance passenger facilities and station capacity in the long run. These improvements are crucial for modernizing the station and improving the overall travel experience for commuters.
Podhigai Express Relocation
The Podhigai Express, a vital link for passengers travelling towards Sengottai, will be rerouting its departures from Tambaram railway station. This temporary shift is in effect from April 7th to April 22nd. The train is scheduled to commence its journey from Tambaram at 8:05 pm during this period. Passengers who typically board at Egmore station must take careful note of this altered boarding location to avoid any travel disruptions. Planning ahead and confirming the departure point is highly recommended for all travellers utilizing this service.
Charminar Express Shift
Another significant alteration involves the Charminar Express, which serves passengers heading to Hyderabad. This train will now originate from Chennai Beach railway station. This revised departure arrangement commenced on April 6th, with the train set to depart at 6:20 pm. This change requires passengers accustomed to boarding the Charminar Express at Egmore to adjust their travel plans and head to Chennai Beach for their journey. It's essential for all travellers booked on this service to verify the new departure station and timing.
Passenger Advisory Issued
Southern Railway officials are strongly advising all passengers to thoroughly check the updated departure points and timings for their respective trains before embarking on their journeys. It is imperative for travellers to plan their commute accordingly, allowing ample extra time to reach the revised stations. These temporary adjustments, while necessary for infrastructure development, could potentially impact usual travel routines. Proactive verification of schedules and departure locations will help ensure a smoother travel experience during this period of upgrades at Egmore.













