Motorists in Springfield should expect overnight lane reductions and temporary ramp closures on portions of U.S. Route 60 and U.S. Route 65 from Sept. 14-17 as crews inspect overhead truss signs.
The work is scheduled from 9 p.m. to 5 a.m. each night, according to a community announcement. Contractor crews will inspect truss signs at multiple locations, including eastbound and westbound U.S. Route 60 between U.S. Route 65 and Interstate 44, the eastbound U.S. Route 60 off-ramp to Campbell Avenue and the northbound U.S. Route 65 off-ramp to eastbound Sunshine Street.
Drivers can expect periodic closures of left lanes and ramps in active work areas. Traffic delays are possible while crews and equipment operate near travel lanes.
Traffic impacts and travel information
Work zone signs will
be posted to alert approaching motorists. Transportation officials are encouraging drivers to consider alternate routes during the overnight operations.
Travelers can monitor current road conditions and closures through MoDOT's traveler information map at traveler.modot.org.
Officials noted in the announcement that weather conditions or construction delays could affect the schedule.
For more information, contact MoDOT's Springfield office at 417-895-7600 or visit modot.org.
This story was produced with the assistance of Artificial Intelligence (AI). Journalists were involved in every step of the review, editing and publishing process. Learn more at cm.usatoday.com/ethical-conduct.
This article originally appeared on Springfield News-Leader: Springfield drivers to see overnight lane closures Sept. 14-17








