These are the applications for new commercial construction permits filed with the Memphis and Shelby County Division of Planning and Development from Aug. 17-Sept. 3.
Apartment Complex
Address: 1296 Appling Road, Cordova
Property owner: Mohamed Eldahan, Bartlett
Applicant: Mohamed Eldahan
Description: 36-unit apartment complex
Status as of Aug. 17: Plan review
Kiddie Academy of Arlington
Address: 5717 Airline Road, Arlington
Property owner: Hossain MD Aulad and DS & K Properties
Applicant: Organization and iDesign Architecture Group
Description: A renovation of an existing day care facility licensed with the State of Tennessee. A new 4,950 square-foot building will be constructed 63 feet west of the existing building and will be connected by an extruded metal walkway. It is licensed for 160 students.
Status as of Aug. 24: Plan review

TraVure (Phase 4)
Address: 6813 Poplar Ave., Germantown
Property owner: Gill Poplar Phase 4 GP, Germantown
Applicant: Brett Grinder of Grinder, Taber & Grinder Inc.
Description: Two-story ground up shell building
Status as of Aug. 31: Plan review
Madonna Learning Center Monarch Classroom Building
Address: 7035 Poplar Ave., Germantown
Property owner: Madonna Learning Center Inc.
Applicant: Tamara Redburn of 4F Design
Description: One-story higher education training facility
Status as of Sept. 1: Plan review
Tiger Trail (Phase 1)
Address: 1206 Tiger Trail, Cordova
Property owner: R & E Properties, Arlington
Applicant: Rocky Wisley of Serenity Hardscapes LLC
Description: Installation of a 199x60-foot prefab metal building with office space, flex space. Built to suit for Production One Co. as the tenant.
Status as of Sept. 3: Plan review
This article originally appeared on Memphis Commercial Appeal: From a day care to a classroom building, what's planned in Memphis?













