What's Happening?
The Welsh Government has initiated the search for a contractor to replace the A494 River Dee Bridge in Flintshire, a project valued at £145 million. This replacement is part of the Major Asset Renewal Programme, addressing the bridge's poor structural condition. The proposed new bridge will feature multiple lanes and a shared-use path for pedestrians and cyclists, with construction designed to minimize traffic disruption. The project also includes significant environmental and infrastructure upgrades, such as new drainage systems and enhanced walking and cycling routes.
Why It's Important?
The replacement of the River Dee Bridge is crucial for maintaining a vital transportation link between north Wales and north-west England. The project is expected to improve traffic flow, enhance safety, and support regional economic growth by facilitating smoother cross-border travel. Additionally, the inclusion of pedestrian and cycling paths aligns with broader sustainability goals, promoting alternative transportation modes and reducing carbon emissions.
What's Next?
Interested contractors must complete a conditions-of-participation stage by the end of September 2025, with the contract award anticipated in May 2026. The project is scheduled to run from June 2026 to March 2030. The competitive tender process will prioritize technical quality, ensuring that the selected contractor can deliver a high-standard infrastructure solution.