What's Happening?
The town of Tisbury and the Martha's Vineyard Commission (MVC) have been awarded nearly $1 million in state grants to address persistent flooding issues at the Five Corners intersection and Beach Road corridor. Tisbury received $500,000 through a state Community
One Stop for Growth program for planning, technical analysis, stakeholder coordination, and preliminary engineering to get a project to 'shovel-ready' status. Separately, the MVC secured a $387,000 grant from the state Municipal Vulnerability Preparedness Program for a 'long-term resilience vision with near-term practical actions and mid-term planning.' These grants aim to build upon previous studies and develop comprehensive solutions for an area frequently inundated by increased rainfall, sea level rise, and storm surge, which impedes access to vital emergency and transportation routes.
Why It's Important?
The Five Corners intersection is a critical transportation hub on Martha's Vineyard, connecting the Martha's Vineyard Hospital and the Steamship Authority's main terminal. Its frequent flooding disrupts daily life, impacts emergency services, and poses significant economic challenges for the island. These grants represent a crucial step towards developing tangible, long-term solutions to a problem exacerbated by climate change. By funding detailed planning and engineering, the grants aim to move beyond studies to actionable projects. This investment is vital for enhancing the resilience of the island's infrastructure, protecting its economy, and ensuring the safety and accessibility of its residents and visitors in the face of environmental changes.
What's Next?
The grants will fund planning and preliminary engineering phases, with the goal of making projects 'shovel-ready.' The MVC's grant will focus on a long-term resilience vision, including engagement sessions with the public and a survey to gather community input on desired solutions, such as relocation or raised roads. A finalized roadmap from the MVC grant is projected for early 2028. The Massachusetts Department of Transportation (MassDOT) is also working on redesigns for the outfall system on Beach Road, which is intended to improve groundwater drainage. While no construction is immediately proposed, these planning efforts are expected to lay the groundwork for future infrastructure projects to mitigate flooding at Five Corners.
Beyond the Headlines
The persistent flooding at Five Corners highlights the broader challenges faced by coastal communities in the U.S. due to climate change. The historical context of the area, built on filled wetlands, underscores how past development decisions can exacerbate current environmental vulnerabilities. The frustration expressed by residents over previous studies without tangible action reflects a common sentiment in communities grappling with long-standing infrastructure issues. These grants, therefore, are not just about flood control but also about building community capacity and consensus for climate adaptation strategies. The long-term success of these initiatives will depend on effective collaboration between local, state, and federal entities, as well as sustained community engagement to implement resilient solutions.













