What's Happening?
Pinnacle Minerals, listed on the ASX as PIM, is advancing a mine restart study and exploration activities at the Lightning Peak open pit within its Thunder Mountain Gold-Silver Project in Idaho, USA. The
initiative aims to evaluate the potential restart of the historic Lightning Peak operation through a combination of technical, field, and geophysical studies. Initial efforts include detailed geological mapping, analysis of historical rock chip and channel sample data, and processing of airborne magnetic and satellite datasets to define structural controls and identify new high-priority drill targets. Assay results from recently collected samples are expected soon and will be incorporated into a 3D model of the Lightning Peak pit to support redevelopment planning and permitting discussions with US regulators. Managing Director Nic Witham emphasized the significance of the project in revitalizing a historic mining district using modern exploration methods.
Why It's Important?
The Thunder Mountain project represents a significant opportunity to rejuvenate a historic mining district in the United States, potentially boosting local economic activity and employment. By leveraging modern exploration techniques, Pinnacle Minerals aims to confirm the mineralization within the project area, which could lead to a successful restart of mining operations. This development could have broader implications for the U.S. mining industry, showcasing the potential for modern technology to revitalize older mining sites. The project's proximity to Perpetua Resources' $4 billion Stibnite Mine further underscores the area's potential as a productive gold and silver district.
What's Next?
Pinnacle Minerals plans to continue interpreting airborne magnetic surveys and multispectral satellite imagery to refine drill targets and improve understanding of the structural setting. These datasets will guide field mapping and drill permitting across several fault-bounded grabens identified as key mineralizing structures. The company is also preparing for discussions with U.S. regulators regarding redevelopment planning and permitting, which will be crucial for the project's advancement. The outcome of these discussions and the forthcoming assay results will play a pivotal role in determining the project's future trajectory.











