What's Happening?
The City of Jonesboro has been awarded a $922,000 Transportation Alternatives Program (TAP) Grant by the Arkansas Department of Transportation (ARDOT). This funding is designated for the construction of a shared-use path that will connect the Southern
Hills Development with Craighead Forest Park. Craighead Forest Park, spanning over 700 acres, is a significant outdoor recreation destination in Jonesboro, attracting more than 100,000 visitors annually for activities such as walking, jogging, cycling, and mountain biking. Currently, vehicular access is the primary means of reaching the park. Mayor Harold Copenhaver stated that this grant will enable the city to connect numerous residences in the immediate vicinity to the park and integrate it into the broader JBR connectivity system. Grants and Community Development Director Chris Richey highlighted the importance of this pathway, particularly along South Culberhouse, which is currently a high-speed, narrow road with no pedestrian protection.
Why It's Important?
This grant represents a significant investment in Jonesboro's infrastructure and quality of life. By creating a shared-use path, the project will enhance pedestrian and cyclist safety, providing a non-vehicular option for residents to access a major recreational area. This initiative aligns with broader urban planning goals to promote active transportation and improve community connectivity. The project is part of a larger effort by Jonesboro to expand its network of trails and pathways, building on previous grants for improvements like the Marion Berry Overpass and the Creath Street MLK Freedom Trail. Such investments are crucial for a growing city like Jonesboro, as they contribute to public health, environmental sustainability by reducing reliance on cars, and overall community well-being. The improved accessibility to Craighead Forest Park is expected to boost its utilization and benefit the local population.
What's Next?
Following the grant award, the project will proceed into a planning and permitting stage. This phase will involve establishing an updated project cost, including advanced engineering and drainage designs. City officials anticipate that grant agreements and approvals for 60% of the construction plans will be finalized by the winter of 2027. Bidding and construction for the shared-use path are projected to commence in 2028. This connection is one of several ongoing and upcoming infrastructure projects in Jonesboro, which collectively total over $100 million in state roadway improvements. Future projects include enhancements to the Marion Berry Overpass, widening of Harrisburg Road/Stadium Boulevard, and a new connector from Highway 351 to Red Wolf Boulevard, indicating a sustained focus on infrastructure development in the city.
Beyond the Headlines
The development of this shared-use path reflects a growing trend in urban planning towards creating more walkable and bikeable communities. Beyond the immediate benefits of recreation and safety, such infrastructure can foster a stronger sense of community by encouraging outdoor activity and social interaction. It also supports local economic development by making the area more attractive to residents and visitors. The emphasis on non-vehicular access to natural spaces can contribute to a healthier lifestyle for residents, potentially reducing public health costs in the long term. Furthermore, by integrating this pathway into a larger connectivity system, Jonesboro is laying the groundwork for a more sustainable and interconnected urban environment, addressing both current needs and future growth challenges.













