SUMMARY
AI Generated Content
- Kavach system installation is progressing "very fast": 2,000 km of rail network covered.
- 7,129 km OFC cables laid, 860 telecom towers installed; 40,000 operators are trained.
- Rail accidents down 90% since 2014 (135 to 11), per Railway Minister Ashwini Vaishnaw.
AD




