Kavach system covers 2,000-km rail network, installation progressing very fast: Vaishnaw

SUMMARY

AI Generated Content
  • Kavach system installation is progressing "very fast": 2,000 km of rail network covered.
  • 7,129 km OFC cables laid, 860 telecom towers installed; 40,000 operators are trained.
  • Rail accidents down 90% since 2014 (135 to 11), per Railway Minister Ashwini Vaishnaw.
AD
AD