SUMMARY
AI Generated Content
- ISRO’s probe found a faulty valve & connector trapped NVS-02 in a suboptimal orbit, Jan 2025.
- The valve failure prevented engine firing; ISRO has tested fixes on CMS-03 after the setback.
- Three ISRO missions have failed in a year; a review is underway to examine contributing factors.
AD




